AERAK Port Code Lookup
Total 1 ports of AERAK
Ras Al Khaimah Port is the seaport of Ras al khaimah, in the city of Ras al khaimahin The united arab emirates. Overseas routes include Middle East, Port code is AERAK.
Port Overview
Ras Al Khaimah Port, UN/LOCODE AERAK, is a sea port in Ras Al Khaimah, The United Arab Emirates, on the Arabian Gulf. Its logistics profile is closely associated with bulk and breakbulk movements serving construction-related activity in the northern UAE and nearby Gulf markets. The supplied port record places the port at 25.8108650° N, 55.9627250° E and describes facilities developed for rock, aggregate, pelletised cement and bagged cement. Our service team treats AERAK as a project- and commodity-sensitive port: vessel acceptance, cargo handling arrangements and container options must be confirmed with the local terminal and carrier before booking.
| Port code | AERAK |
|---|---|
| Port / city | RAS AL KHAIMAH, Ras Al Khaimah |
| Country | The United Arab Emirates (AE) |
| Coordinates | 25.8108650° N, 55.9627250° E |
| Primary operating profile | Sea port with bulk, breakbulk and reported container-related capability |
Key Highlights
Bulk-oriented cargo mix
The supplied record identifies rock and aggregate, pelletised cement and bagged cement as important cargo types, making cargo density, dust control and discharge planning central to the operation.
Breakbulk and multipurpose handling
The record describes seven jetties at opening and an expansion plan involving two additional multipurpose jetties; current berth availability must be confirmed for each shipment.
Vessel compatibility matters
A maximum vessel length of 101 metres is stated in the supplied historical record. This should be treated as a reference point rather than a current acceptance limit.
Container planning requires validation
Although the source record mentions container capacity and FCL records are present in the port database, our team should verify current container service, equipment, terminal cut-offs and carrier routing before quotation.
Facilities & Services
- Marine access and jetties: The supplied port description refers to seven jetties and planned multipurpose additions. Berth nomination, vessel dimensions, arrival window and cargo handling method should be checked case by case.
- Bulk and breakbulk operations: The port record specifically associates AERAK with rock, aggregate and cement products. Our team can coordinate discharge plans, cargo securing information and delivery sequencing after terminal confirmation.
- Containerized cargo: The database records FCL capability but no LCL service record. FCL acceptance, empty-container positioning, reefer support, equipment availability and terminal handling terms must be confirmed before issuing a firm offer.
- Storage and yard planning: Yard, silo, covered storage and open-stack availability should not be assumed. Cement, minerals and other dusty or moisture-sensitive cargo require written confirmation of the applicable storage and handling arrangement.
- Road distribution: Road haulage is the practical inland connection for deliveries in Ras Al Khaimah and surrounding UAE markets. Vehicle type, axle limits, delivery permits, site access and appointment requirements should be checked against the final cargo dimensions.
Routes & Transit Times
- Typical routing logic: Ocean cargo may be offered through a direct port call where commercially available, or through a regional Gulf transshipment connection. The actual option depends on carrier acceptance, cargo type, equipment and vessel schedule.
- Common trade direction: Cargo may be planned from or to South Asia, Southeast Asia, the Indian subcontinent, East Africa and other Gulf markets, subject to the carrier’s published network and port rotation.
- Transit-time control: We quote transit on the basis of the confirmed sailing, transshipment plan and terminal window. Port congestion, berth sequencing, customs release, weather, documentation discrepancies and last-mile appointment availability can extend the overall cycle.
- Breakbulk and project cargo: Heavy or out-of-gauge shipments usually require pre-clearance of dimensions, lifting points, stowage, vessel suitability and road delivery conditions; a standard container transit estimate is not appropriate.
Hinterland & Key Cargo
Ras Al Khaimah industrial base
The port is relevant to construction-material supply chains and industrial distribution in Ras Al Khaimah. Delivery planning should match the consignee’s plant, stockyard or project site rather than relying only on the port name.
UAE northern market
Potential inland destinations include northern UAE industrial and construction areas. Road distance, vehicle restrictions, site unloading capability and delivery appointments can materially affect the landed logistics cost.
Construction materials
Rock, aggregate, cement and related bulk or bagged products are the clearest cargo associations in the supplied port description. Packaging integrity, moisture protection and dust-control procedures are operational priorities.
General and project cargo
Multipurpose handling may support selected breakbulk or project shipments, but cargo weight, dimensions, lifting arrangements and berth availability must be validated before booking.
Operations & Compliance
- Cut-offs and cargo readiness: Booking cut-off, shipping-instruction deadline, VGM deadline, gate-in window and terminal receiving status vary by carrier and shipment. Our service team obtains the operative cut-offs in writing rather than applying a generic schedule.
- Dangerous goods: Cement additives, chemicals, fuels and other regulated cargo require the correct UN number, proper shipping name, class, packing group, SDS and compliant packing. DG acceptance must be secured before cargo dispatch.
- Customs and documents: Commercial invoice, packing list, transport document, certificate of origin and any commodity-specific permit should be consistent in description, quantity, weight and consignee details. Customs classification and import controls should be checked before arrival.
- Inspection and inland delivery: Customs or terminal inspection can require document presentation, unpacking, re-sealing, extra handling and vehicle waiting time. For heavy or bulk cargo, weighbridge records, axle compliance and unloading-site readiness should be arranged in advance.
Shipping Tips
- Send our team the commodity, HS code, packing method, total weight, package dimensions, cargo value, destination address and required delivery date before we select a routing.
- For cement, minerals and aggregates, confirm whether the cargo is bagged, palletized, bulk or containerized; specify moisture protection, dust-control needs and discharge equipment at the receiving site.
- For heavy, long or project cargo, provide a dimensioned packing list, centre of gravity, lifting points, photographs and proposed vehicle details so berth and road feasibility can be reviewed together.
- Keep a contingency plan covering regional transshipment, an alternative UAE gateway or temporary inland storage when equipment, berth windows or the intended sailing are not confirmed.
Frequently Asked Questions
Can AERAK handle container shipments?
The supplied database contains an FCL record, while no LCL record is shown. Our team will verify the current carrier, equipment, terminal receiving window and empty-container arrangement before confirming an FCL booking. LCL should not be assumed to be available at the port.
Is the stated 101-metre vessel limit still applicable?
The 101-metre figure comes from the supplied port description and is presented as the maximum length of vessels recorded as having entered the port. It is not a current guaranteed limit; vessel acceptance must be checked with the port or operating agent for the proposed ship.
What cargo is most suitable for this port?
The source description particularly identifies rock, aggregate, pelletised cement and bagged cement. General or project cargo may also be considered where multipurpose handling and road delivery are confirmed for the specific shipment.
How early should cargo and documents be prepared?
There is no universal AERAK cut-off applicable to every carrier or cargo type. Our service team confirms booking, SI, VGM, DG and gate-in deadlines after the carrier and terminal are identified, with additional lead time for inspections or project cargo approval.
What is the best inland delivery approach?
Road delivery is generally the practical option for Ras Al Khaimah and nearby UAE destinations. The final plan should include vehicle suitability, axle and dimension restrictions, delivery appointment, unloading equipment and any permit requirement.
Data Sources & Provenance
The port code, name, country, city, coordinates and historical descriptive figures in this module are taken from the supplied AERAK port record. Historical statements concerning jetty development, recorded vessel length and container-capacity plans are retained with appropriate qualification and should not be interpreted as current operating guarantees.
For current berth acceptance, cargo restrictions, terminal procedures and port operating arrangements, our team uses the port operator’s official information and shipment-specific written confirmation. A relevant official reference domain is rakports.ae. Customs and import-control requirements should be checked against applicable UAE government channels, including u.ae.
Schedules, cut-offs, equipment availability, inspection practice, storage arrangements, charges and road-delivery restrictions are time-sensitive and require confirmation before cargo dispatch.